How to Get a Building Permit in Canada?

Are you thinking of extensively renovating or remodeling your home? Then, you will need a building permit. It can be frustrating to get a permit. However, there is no need to worry as this post aims to provide you with all the information you need to get one. The following tips will come in handy.

  1. More Than One Permit Is Required

To get your house renovated, you would first need to get it demolished. To do so, you will require a permit to construct the new structure. Separate permits will be required for all the electrical and plumbing work. At the same time, it might be a requirement for you to obtain ventilation/ heating plans and arborist reports. Discuss your plans with the planning department to find out which permits will be required. For example, if you intend to tear down the old closet and bathroom and have it rebuilt to look like a spa suite, you will need four permits for the demolition, new construction, plumbing, and electrical.

  1. Pay Fees

When it comes to acquiring a permit, you would need to pay fees. The amount of fees that you would have to pay depend on the amount of work and the type of work that needs to be done as well as the square footage involved. For example, if you want to remodel a home in Scarborough, you would have to apply to get a remodel permit which costs around $2.15 for each square meter. The price will increase to $4.15 for each square meter if the renovated area is over 1,000 square feet. You might need to get a personal loan in Ontario to pay these fees.

  1. Inspectors Require Time

Projects are reviewed by the building inspectors during each stage of the construction so that the work follows the building code requirements and meet the framework as set out under the submitted approved plan. Keep in mind that the inspectors would visit more than once to ensure that it is in accordance with the plan. To book an inspection, inspectors would inform you at least 48 hours prior to the inspection. If you live in Toronto, the City of Toronto Planning Department only requires a 5 days’ notice for electrical inspection. However, it is possible for homeowners to wait for up to 3 weeks or even longer. Do not proceed with the work until the inspector comes as inspectors have to monitor the work being done.

  1. Learn from Inspectors

Whenever an inspector arrives to conduct the inspection, you should take advantage of their hands-on experience and learn more about the procedure from them. Make sure to always be on site when the inspector does come. Besides, it is always a good idea to be at the site to ensure that you pass the inspection. The secret to getting the desired building permit is knowledge of the building code.

Conclusion

To avoid complications and get a residential permit in record time, it is best that you hire a company that specializes in helping clients receive residential permits such as Acadia Drafting.